Overview

  • Founded Date January 1, 1900
  • Sectors Logistics
  • Posted Jobs 0
  • Viewed 33

Company Description

Sino Minerals Investments Co. Ltd is a private mineral exploration and extraction enterprise operating in Uganda. Incorporated in 2010, the company maintains its primary corporate headquarters on Fifth Street in the Industrial Area of Kampala. It was established to legally tap into Uganda’s rich subsurface mineral wealth, quickly growing into a key industrial player within the country’s emerging metallurgy and heavy mining landscape. 
The company specializes in geological exploration, mining development, and localized material processing, particularly in southwestern Uganda. Between 2010 and 2016, its technical teams conducted extensive field studies across several districts, identifying gold in Bushenyi and Buhweju, wolfram in Rubanda, and massive iron ore reserves in Kabale and Kisoro. Its foundational asset is located in Buhara, Kabale, where detailed diamond drilling operations successfully delineated a proven deposit containing roughly thirty million tons of high-grade iron ore. 
To add local value to its extraction operations, the corporation is executing a massive thirty-four-million-dollar multi-phase infrastructure expansion. Under guidance from the central government and local district leaders, the firm secured approval to establish a specialized pig iron factory alongside its existing ore crushing plant in Kyaase Village, Buhara sub-county. This strategic facility is designed to process raw ore into molten pig iron locally, helping Uganda substitute expensive foreign metal imports and supply raw components directly to regional steel mills. 
The corporate social responsibility initiatives, localized mining assets, and operational parameters managed by the company include:
  • Mining Lease 1297: The primary statutory concession covering the Buhara deposit used to execute large-scale, long-term mine development.
  • Annual Output Capacity: Engineered to extract and process approximately three hundred thousand tons of iron ore every year. 
  • Three-Phase Factory Project: Outlines an investment plan scaling from fundamental pig iron production up to advanced steel billets and finished steel structures.
  • Infrastructure and Utility Relief: Installs community water pipelines, builds solar-powered streetlights, and funds the mechanical renovation of public roads around its mining sites. 
  • Socio-Economic Safety Nets: Sponsors local university students annually and distributes medical equipment alongside monthly living stipends to elderly residents in surrounding villages.

Leave Your Review

  • Overall Rating 0